LOCATION OF PROJECT: Mesa, Arizona
START DATE: January 2015
COMPLETION DATE: December 2015
OWNER: Banner Health
CONTRACT WITH: DPR Construction
ARCHITECT: HKS, Inc.
ENGINEER: CCRD Partners
ORIGINAL DD BUDGET: Design Assist to Develop Budgets
FINAL CC CONTRACT $5,442,000

Description of Project

Banner Desert 2A MOSU (Multi-Organization Service Unit), OR/Pre-Op Expansion and ED Resuscitation Bays project consisted of a complete remodel of Banner Desert Medical Center’s A Tower 2nd Floor, including three (3) new OR’s and enlargement of the existing Pre-Op.  The existing 1st, 3rd and 4th floors of A Tower each have (36) small (+/- 150 SF) inpatient rooms and this project is intended to provide (20) larger (+/- 280 SF) Banner template, AIA 2010 compliant, patient rooms.

Do to the complexity of the previous 36 room layout and the “new” 20 room layout, all plumbing water, waste, vent and roof drain stack riser piping had to be offset in the 1st floor ceiling to new 2nd floor wall locations and then reconnected in the 2nd floor ceiling to existing 3rd & 4th floors maintain normal facility operations during construction as these other floors would not be remodeled to the new room template until a future date. When this offset piping relocation occurred, future waste & vent pipe and fittings were added along with domestic water valves to minimize disruption to the floors above and below for future connection of the new piping from the 2nd floor.

Each floor of the original design is served by dedicated air handlers located in mechanical rooms on the particular floor served. As a part of this project scope, a new 55,000cfm Temtrol air handling unit was installed on the roof to serve two floors (2nd & 4th) with provisions of adding a future 55,000cfm air handling unit to serve the remaining two floors (1st & 3rd) at a later date when those floors are remodeled to match the new Banner room template. Two new shafts were constructed on the south side of the building to accommodate the new 84”x64” supply air and 108”x64 return air duct from the AHU down the building with dampers at all four floors.

New Temtrol air handling units were also installed for the Pre-Op / PACU (18,000cfm – within an existing penthouse) and CVOR (12,000cfm –2nd story roof) remodeled spaces.

As always, the fast track construction was aided by the fully coordinated BIM model driven and managed by W.D. Manor.

Mission Statement

W. D. Manor is committed to uncompromised quality and service. We provide the best possible mechanical contractor products, services and leadership. We emphasize teamwork, unparalleled training and development of our employees with continuous improvement in everything we do.

Need Support Now?

W.D. Manor provides Client Support:

  • 24 hours a day
  • 7 days a week
  • 365 days a year

Call now: (602) 253-0703

Contact W.D. Manor

Address:
1838 North 23rd Avenue Phx, AZ 85009
Phone: (602) 253-0703

Hours:
Monday - Friday 8am–6pm

Contact Us